RESTADO s.r.o.
Lipského 9
841 01 Bratislava
Po - Pi
08 - 19:00

Motorway D1 Hričovské Podhradie – Lietavská Lúčka

The construction is carried out in Žilina territory, in administrative area Dolný Hričov, Ovčiarsko, Bitarová, Brezany, Hôrky, Žilina-Bánová, Žilina-Bytčica, Lietavská Lúčka.

Construction Supervision Engineer Serivces for the project "Motorway D1 Hričovské Podhradie – Lietavská Lúčka"

 

Employer: Národná diaľničná spoločnosť, a.s./National Motorway Company
Constructor: Združenie Ovčiarsko consists of Doprastav, a.s. – leading company of Joint Venture, members - Váhostav-SK, a.s., STRABAG s.r.o., Metrostav, a.s.
Project Value: 427 201 094,97 € excl. VAT
Commencement Date: 22 January 2014
Completion Date: 21 January 2018

 

Project Description

The construction is realized in Žilina territory, in the administrative area Dolny Hricov, Ovčiarsko, Bitarová, Brezany, Hôrky, Žilina-Bánová, Žilina-Bytčica, Lietavská Lúčka. The construction is carried out in full profile 4-streamer, directionally separated road of  D26, 5/100 category. The construction has 2 two-pipe tunnels of category T / 80, tunnel Ovčiarsko in the length of 2367 m and tunnel Zilina in the length of 687 m, 11 bridges, total length of bridges is 3,552 m (length of the longest bridge is 1060 m) 3 retaining walls 275 m and several noise barriers in a length of 4 050 m.

This construction has a number of relocations and adjustmens of first class roads (8700 m), III. Class (8600 m), and local access roads (2,500 meters). The project also includes  realization of 3537 m adjustments on the 10-watercourses, 233 transhipment and regulation on water supply, 3 456 m transhipments and sewerage arrangements and, in addition, a number of transhipments and other utilities. The total length of motorways is 11 320 m.