OSH Coordinator on Site for Project "Highway D1 Bratislava – Trnava, Intersection Triblavina"
Employer: Národná diaľničná spoločnosť, a.s./National Motorway Company
Constructor: PORR s.r.o.
Project Value: 19 750 470,47 € exl. VAT
Commenecement Date: 1st. April 2015
Completion Date: in realization, completion date assumed of construction April 2017
Project Description
Construction of the intersection at km 18.09 D1 connected to the D1 motorway through parallel two-line collector in category C9,5/80 along both sides of the motorway D1. Collector strips are designed with the future expansion of the D1 motorway in category D 33,5/120. The project consists of 4 circular intersections and 4 bridges.